Projects

Delivering Integrated Marine and Environmental Solutions

At Strong Marine & Environmental, our projects represent the real-world application of integrated marine construction, coastal infrastructure, and environmental solutions delivered in some of the most demanding marine environments. Backed by more than 30 years of construction expertise through Strong Enterprises, each project reflects our commitment to engineering precision, innovation on the water, and responsible environmental stewardship.

Building with strength. Protecting with purpose.

Together let’s build something that lasts.

Featured Work

Ontario Street Boat Launch

The City of Quinte West is home to the Trent Port Marina situated on the shores of the beautiful Bay of Quinte and serving as the gateway to the world famous Trent Severn Waterway. Work under this contract included reconstruction of the boat launch ramp at the Centennial Park location, on the eastern bank of the Trent River in Quinte West. Requirements of Project:
  • Dredging works
  • Traffic control and signage
  • Installation of turbidity curtains
  • Supply, install and removal of containment system
  • Dewater dredged sediment
  • Earthworks
  • Supply installation of docks and floating ramps
  • Parking lot
  • Culvert replacement

Marginal Wharf Construction

Glace Bay Harbour, located in Nova Scotia, is a vital year-round commercial fishery. This project involved the replacement of eleven aging and structurally deficient wharf structures along the harbour’s eastern shoreline. The new marginal wharf was designed to modernize infrastructure, improve safety, and ensure long-term operational viability for the harbour and surrounding fishing community.

Requirements of Project:

  • Marine pile installation
  • Concrete pile caps
  • Deck construction
  • Timber fendering system installation
  • Tie-back structural wall system
  • Construction of marginal wharf
  • Retaining wall construction
  • Backfilling, compaction, & grading
  • Integration with existing harbour infrastructure
  • Environmental protection & regulatory compliance

Bluffer’s Park Marina

Bluffer’s Park Marina, located along the Scarborough Bluffs on Lake Ontario, is a recreational boating centre within the GTA. Marine construction and maintenance work focused on improving safe navigation, addressing ongoing sedimentation issues at the marina entrance, and stabilizing surrounding shoreline infrastructure. Requirements of Project:
      • Dredging marina entrance
      • Sediment removal
      • Erosion control measures
      • Shoreline protection and stabilization works
      • Compliance with Ontario Provincial Standards & Specifications
      • Environmental protection & monitoring
      • Temporary staging & stockpiling within active waterfront area